Shift Handover Log
Instructions: Complete all mandatory sections (★) before briefing the incoming shift. Save this log in the ticketing system or shared drive after both leads sign off.
| Field |
Value |
| Date |
YYYY-MM-DD |
| Shift |
☐ Morning (08:00–16:00) · ☐ Afternoon (16:00–00:00) · ☐ Night (00:00–08:00) |
| Outgoing Lead |
[Name] |
| Incoming Lead |
[Name] |
| Handoff Time |
HH:MM |
★ 1. Shift Summary
Overall Status: ☐ Quiet · ☐ Normal · ☐ Busy · ☐ Critical
Narrative Summary:
Provide a 2–3 sentence overview of the shift. Highlight any escalations, notable events, or management directives received.
★ 2. Active Incidents (Requiring Attention)
| ID |
Severity |
Category |
Description |
Current Status |
Owner |
Next Action |
ETA |
| #___ |
Critical/High/Med/Low |
Phishing/Malware/etc |
Brief description |
Triage/Investigation/Containment/etc |
[Name] |
What needs to happen next |
When |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Total Active: _ | Critical/High: _ | Awaiting Escalation: ____
★ 3. System Health
| System |
Status |
Notes |
| SIEM Ingestion |
☐ Normal · ☐ Degraded · ☐ Down |
|
| EDR Connectivity |
☐ Normal · ☐ Degraded · ☐ Down |
|
| SOAR Playbooks |
☐ Normal · ☐ Degraded · ☐ Down |
|
| TI Feed Updates |
☐ Normal · ☐ Delayed · ☐ Down |
|
| Ticketing System |
☐ Normal · ☐ Degraded · ☐ Down |
|
| Network Sensors |
☐ Normal · ☐ Degraded · ☐ Down |
|
| Email Gateway |
☐ Normal · ☐ Degraded · ☐ Down |
|
Known Issues:
Describe any ongoing system degradation, scheduled maintenance, or license expirations.
★ 4. Pending Tasks / Follow-ups
| # |
Task |
Related Ticket |
Priority |
Assigned To |
Due |
| 1 |
|
|
High/Med/Low |
|
|
| 2 |
|
|
|
|
|
| 3 |
|
|
|
|
|
★ 5. Intelligence & Advisories
New Threat Intelligence
| Source |
Summary |
IoCs Added? |
Action Required? |
|
|
☐ Yes · ☐ No |
☐ Yes · ☐ No |
Vulnerability Advisories
| CVE |
Affected Systems |
Severity |
Patch Available? |
Action |
|
|
|
☐ Yes · ☐ No |
|
6. Escalations (if applicable)
| Escalated To |
Reason |
Time |
Response Received? |
Status |
|
|
|
☐ Yes · ☐ No |
|
7. Change Advisories (if applicable)
| Change ID |
System |
Description |
Window |
Impact on Alerts? |
|
|
|
|
☐ Yes · ☐ No |
8. Compliance Deadlines (if applicable)
| Deadline |
Regulation |
Description |
Days Remaining |
Owner |
|
PDPA / ISO 27001 / etc |
|
|
|
★ Shift Statistics
| Metric |
Count |
| Alerts Processed |
|
| Incidents Opened |
|
| Incidents Closed |
|
| Escalations Made |
|
| False Positives Identified |
|
| Average Response Time (MTTA) |
min |
★ Sign-off
|
Outgoing Lead |
Incoming Lead |
| Name |
|
|
| Signature |
|
|
| Time |
|
|
⚠️ Both leads must sign off to confirm that the briefing was conducted and all mandatory sections were reviewed.
Completed Handover Example
## Shift Handover — 2026-02-16 (Day → Night)
### Outgoing Analyst: John D. (Shift A)
### Incoming Analyst: Sarah T. (Shift B)
### Open Incidents
| Ticket ID | Severity | Status | Summary | Action Needed |
|:---|:---:|:---|:---|:---|
| INC-2026-089 | P2 | Investigating | Suspicious PowerShell on HR-PC-042 | Waiting EDR isolation approval |
| INC-2026-091 | P3 | Monitoring | Failed VPN logins from unknown IP | 12 more hours monitoring |
### Alert Queue Status
- Current queue: 14 alerts (7 low, 5 medium, 2 high)
- 2 high alerts need immediate triage
### System Health
- SIEM: ✅ Normal | EDR: ✅ Normal | Ticketing: ✅ Normal
- Log source gap: Firewall FL-02 offline since 14:30 (IT notified)
### Notes for Incoming
1. IMPORTANT: INC-089 — SOC Manager approved isolation, proceed when evidence captured
2. New Sigma rule deployed for CVE-2026-1234, may generate initial FPs
3. Scheduled maintenance for SIEM at 03:00, expect 15-min search delay
Common Handover Mistakes
| ❌ Mistake |
Impact |
✅ Best Practice |
| Verbal-only handover |
Details forgotten, context lost |
Always write in template + brief verbally |
| Not mentioning system issues |
Incoming analyst misses data gaps |
Always check and report log source health |
| Incomplete incident summary |
Time wasted re-investigating |
Include: what happened, what's done, what's needed |
| Forgetting pending approvals |
Containment delayed |
List ALL pending approvals/waiting items |
| No alert queue status |
Queue overflows |
Always report queue depth and priority counts |
References